About the project
The construction project is a unique residential development aimed at fostering cohabitation among different social groups. The project consists of a 6-story residential building with a total area of 3510 sq.m. The apartment areas vary, ranging from 17.8 to 36.6 square metersA well-maintained yard is planned, including a children's playground
Available units
# / Floor
Type
Rooms
Area
Price
Status
№ P-01
Fl. -1
Parking
—
15.0 m²
€ 12 000
Available
Details →
№ 11-12
Fl. 1
Apartment
2
58.4 m²
€ 145 000
Available
Details →
№ 11-23
Fl. 2
Apartment
3
74.8 m²
€ 189 000
Available
Details →
№ 11-31
Fl. 3
Apartment
1
38.9 m²
€ 98 000
Reserved
Details →
№ 11-42
Fl. 4
Apartment
2
61.2 m²
€ 152 000
Available
Details →
№ 11-63
Fl. 6
Penthouse
3
112.0 m²
€ 310 000
Available
Details →
Check availability of all apartments
Construction progress
10.06.2026 · 85%
Apartment finishing: floors 4–6
Plastering and floor screed completed on floors 4–6. Window and entrance door installation started. Handover planned for Q4 2026.
20.05.2026 · 78%
Interior works: utility systems routing
Electrical cabling, water supply and sewage completed on all 6 floors. Ventilation system installation underway.
30.04.2026 · 68%
Roof and facade: final stage
Roof installation complete. Facade works 70% done. Stairwell and utility room finishing started.
25.03.2026 · 52%
Above-ground section: floors 1–3
Floors 1–3 slabs completed. Facade panel installation started on ground floor. Engineering systems routing in progress.
18.02.2026 · 35%
Ground floor: monolithic frame construction
Reinforced concrete monolithic frame of the ground floor completed 100%. Formwork for 2nd floor installed. Works on schedule.
10.01.2026 · 20%
Foundation slab completed
Monolithic foundation slab installed. Ø400mm piles driven to 14m depth. Underground parking waterproofing underway.